Water Levels and Production

Date
Static Water Level
Yield
Date: 06/28/2000
Static Water Level: 70.00 ft
Yield: 403 gallons per minute
Date
06/28/2000 
Start Time
08:30 
Aquifer
Unknown 
Static Water Level
70.00 ft
Yield
403 gallons per minute
Pumping Water Level
114 ft
Yield Method
Unknown
Measurement
Unknown 
Pump Test
Yes
Pump Method
Pumped 
Duration
200 mins
Comments
Date: 07/06/2000
Static Water Level: 67.00 ft
Yield: 403 gallons per minute
Date
07/06/2000 
Start Time
07:30 
Aquifer
Unknown 
Static Water Level
67.00 ft
Yield
403 gallons per minute
Pumping Water Level
113 ft
Yield Method
Unknown
Measurement
Unknown 
Pump Test
Yes
Pump Method
Pumped 
Duration
2400 mins
Comments
Date: 08/03/2015
Static Water Level: 56.00 ft
Yield: 183 gallons per minute
Date
08/03/2015 
Start Time
 
Aquifer
 
Static Water Level
56.00 ft
Yield
183 gallons per minute
Pumping Water Level
77 ft
Yield Method
Unknown
Measurement
Unknown 
Pump Test
No
Pump Method
Unknown 
Duration
360 mins
Comments
Reported on 2015 DNR Dakota survey.