Water Levels and Production

Date
Static Water Level
Yield
Date: 07/16/2003
Static Water Level: 18.00 ft
Yield: 680 gallons per minute
Date
07/16/2003 
Start Time
20:30 
Aquifer
Alluvium 
Static Water Level
18.00 ft
Yield
680 gallons per minute
Pumping Water Level
31 ft
Yield Method
Orifice
Measurement
Tape 
Pump Test
Yes
Pump Method
Bailed 
Duration
700 mins
Comments